• Home
  • Menu
    • ABOUT US
    • SERVICES
    • DRONE
    • REGULATORY GUIDENCE
    • INDUSTRY BODIES
    • BLOG
    • CSR
    • Carbon Plan
    • Clients and Case Studies
    • CONTACT US
  • More
    • Home
    • Menu
      • ABOUT US
      • SERVICES
      • DRONE
      • REGULATORY GUIDENCE
      • INDUSTRY BODIES
      • BLOG
      • CSR
      • Carbon Plan
      • Clients and Case Studies
      • CONTACT US
  • Sign In
  • Create Account

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • Menu
    • ABOUT US
    • SERVICES
    • DRONE
    • REGULATORY GUIDENCE
    • INDUSTRY BODIES
    • BLOG
    • CSR
    • Carbon Plan
    • Clients and Case Studies
    • CONTACT US

Account


  • My Account
  • Sign out


  • Sign In
  • My Account
PGSO Ltd

OUR CLIENTS

CASE STUDIES

JCA

Works we have completed for JCA

M&E asset collection, validation & condition

We supported JCA with the asset validation & condition reporting for one of their premier clients in the heart of London.   

Mitie

Works we have completed for Mitie

M&E asset collection, validation & condition

We supported Mitie with the asset collection for one of their very large national distribution clients. Attending multiple sites up and down the country.  We provided the required information in their format so it could seamlessly slot into their work stream.    

Integral A jll cOMPANY

Works we have completed with Integral

Project Management

We have provided project management for a number of Integrals clients.

Client 1 - Project management of asset collection across 1600 sites (Banking)

Client 2 - Project management of asset collection across 1480 sites (Pharmaceutical) 

Client 3 - Project management of asset collection across 450 sites (Charity)

Client 4 - Project management of asset collection across 45 sites (Utilities)

Asset Validation & Asset Collection

We carried out the full asset validation for 2 large London schools which lead to us carrying out the in depth asset collection and asset tagging providing the information into the CAFM upload format. Working with the site teams for access during school holidays and weekends to minimise any disruption to the schools.

Gap Analysis

We were tasked with carrying out gap analysis comparing the data collected from the asset collection projects to what was tendered against.  Providing the data in an easy to read format and presenting to Integral and their client.  

Asset Labels

We designed and supplied many 000's of asset labels for the asset collection projects.  Discussing the designs with Integral and their clients and then getting the agreed labels printed and delivered to the teams.

Meetings

We have attended regular meetings with Integral and their clients discussing the projects and the data collected.  

Tila Commercial

Works we have completed for Tila

M&E Tendering

We have produced the full tender paperwork and run the successful tendering of a number of high end sites for Tila Commercial

M&E plant room condition reports

We carried out the full inspection of the plant rooms in a number of buildings.  Photographic PDFs produced showing the condition of the plant and any recommendations

CoSourced

Works we have completed for CoSourced

M&E asset collection and condition

We carried out the full inspection of the M&E assets across to very large school sites.  Producing a detailed asset list and a photographic PDF condition report. 

Defluo

Works we have completed for Defluo

Drone Surveys

We carried out the a number of detailed high resolution drone surveys  for Defluo.


Copyright © 2022 PGSO Ltd - All Rights Reserved.


Company Reg 12960911 - VAT no.  361 0777 04 

  • Privacy Policy
  • Modern Slavery Statement
  • COVID-19 Policy

Powered by